The accountability era
Environmental value accountable to reality
Connecting nature‑based projects, evidence and responsible decisions — with SIS v5.0 as the framework.
Nature, people and evidence at the centre
Work with Spera Impact
Find your starting point
Bring a landscape, an institutional mandate or a business challenge. Find the right starting point and the people responsible for the next step.
Develop a project
Explore project readiness, community participation, evidence and the requirements for long-term stewardship.
Project pathwaysBuild national capacity
Connect institutions and accountable records while competent national authorities retain their mandates.
Sovereign architectureConnect business and capital
Explore project finance, product accountability and reporting grounded in identifiable evidence and responsibilities.
Partnership opportunities
Ecological integrity before marketability
The living world comes first
Environmental value begins with the condition of a place and the rights of its people. A market instrument comes later.
Keep outcomes distinct
Carbon, biodiversity, water and community rights require their own evidence. A positive result in one area does not erase an obligation in another.
Keep evidence open
Methods, uncertainty and changing ecological conditions must remain visible. Material concerns need a route to challenge and correction.
Responsibility over time
Monitoring, stewardship finance and unresolved ecological obligations remain part of the accountability story.
Connected accountability
Follow the evidence
The value is in the connections: the place behind a record, the evidence behind a decision and the authority behind a permitted use.
- 01 — REALITY
A place and its people
Identifiable landscapes, activities, rights-holders and conditions over time.
- 02 — EVIDENCE
A record you can examine
Attributable observations, methods, uncertainty and assessment.
- 03 — RESPONSIBILITY
A decision with an owner
Defined rights, obligations and decisions from the competent source.
- 04 — PERMITTED USE
A claim within its limits
Relevant lifecycle records and the conditions that govern a particular use.
This is an illustrative reading path. Evidence, assessment, registry state and sovereign authority remain distinct. Payment does not establish an outcome; retirement alone does not grant claim permission.
Explore the infrastructureThe SIS framework
Explore the standard
Start with the reader’s guide to the main standard and its supporting appendices. Continue to the review portal if you have access.
2. November 2026 – Public Review Draft v0.51. The edition is review material and does not establish adoption, certification or project conformity.

People are part of the foundation
Participation that lasts
Rights-holder standing, consent, benefit sharing and access to remedy belong throughout the project lifecycle. Local participation must remain connected to the decisions that affect people.
Explore responsible project development